EchoBeam 80-GHz radar level sensors from Flowline provide reliable, simple, flexible and maintenance-free non-contact level measurement of liquid and solids in tanks, sumps, silos and open channel weirs or flumes.
One sensor, four models, all applications. Watch now...
EchoBeam is the most reliable and easy-to-use non-contact level sensor.
Flowline’s 80 GHz radar technology is unaffected by most media, process or environmental factors, and their intuitive LevelTap App makes configuration simple.
Explore the advantages of EchoBeam reliable level measurement...
- 80-GHz technology provides reliable, maintenance-free operation
- Measures level height, air gap, tank volume or open channel flow
- Rugged PVDF antenna and enclosure for corrosive liquid or solids
- IP68 rated sensor for harsh outdoor or below grade installations
- Shielded 10m PVC jacketed cable for corrosive level environments
- Zero dead band maximizes the potential fill capacity of small tanks
- Optionally measures through top wall of plastic or fiberglass tanks
- Bluetooth wireless configuration via the LevelTap™ mobile App
- Lowest cost radar sensor for your basic level requirements
Thanks to these many advantages, Flowline's EchoBeam 80-GHz radar level sensors have won Process Instrumentation’s Innovation Award given to the best new measurement solutions of 2024.
Discover Examples of Application Success